In 1961, near Garda Lake in Italy, Myrtha Pools made its first splash in the aquatics market.
Since that time, Myrtha has transformed the aquatics industry worldwide, with innovative pool design, breakthrough technology and game-changing efficiency.
As we approach our 60th year, we continue to shape the future of aquatics with creativity, innovation and leadership.
Design, manufacture, build, install… it’s all in day’s work. In more than 70 countries worldwide, we’ve installed 10’s of thousands of pools.
With a portfolio of patents to our name, our research and development success has helped us transform pool building technology. We continue to push at the edges of our industry to find safer, smarter, lighter, tougher, faster ways to compete.
We have conquered climates (Iceland, Saudi Arabia), been to the Olympics (Atlanta, Beijing, London, Rio), we create restorative wellness pools, magical infinity pools and magnificent water parks.
And perhaps most amazingly, the majority of the World Records in swimming were set in Myrtha pools! So, the most amazing thing in this “About Us” section, isn’t even about us, it’s about swimming. And that’s the way we like it.
Area LEED v4.1 BD+C - Integrative process
Credit | Integrative process |
MYRTHA POOLS
|
Area LEED v4.1 BD+C - Water Efficiency
Credit | Indoor Water Use Reduction |
MYRTHA POOLS
|
Credit | Outdoor Water Use Reduction |
MYRTHA POOLS
|
Credit | Water Metering |
MYRTHA POOLS
|
Area LEED v4.1 BD+C - Energy and Atmosphere
Credit | Enhanced Commissioning |
MYRTHA POOLS
|
Prereq | Fundamental Commissioning and Verification |
MYRTHA POOLS
|
Credit | Optimize Energy Performance |
MYRTHA POOLS
|
Area LEED v4.1 BD+C - Materials and Resources
Credit | Building Life-Cycle Impact Reduction |
MYRTHA POOLS
|
Credit | Environmental Product Declarations |
MYRTHA POOLS
|
Credit | Material Ingredients |
MYRTHA POOLS
|
Credit | Sourcing of Raw Materials |
MYRTHA POOLS
|
Area LEED v4.1 BD+C - Indoor Environmental Quality
Credit | Low-Emitting Materials |
MYRTHA POOLS
|
Area LEED v4.1 BD+C - Innovation
Credit | Innovation |
MYRTHA POOLS
|
Area BREEAM - MANAGEMENT
Man 01 | Project Brief and design |
MYRTHA POOLS
|
Man 02 | Life cycle cost and service life planning |
MYRTHA POOLS
|
Man 04 | Commissioning and Handover |
MYRTHA POOLS
|
Area BREEAM - HEALTH AND WELLBEING
Hea 02 | Indoor Air Quality |
MYRTHA POOLS
|
Hea 09 | Water quality |
MYRTHA POOLS
|
Area BREEAM - ENERGY
Ene 01 | Reduction of energy use and carbon emission |
MYRTHA POOLS
|
Area BREEAM - MATERIALS
Mat01 | Life cycle impacts |
MYRTHA POOLS
|
Mat05 | Design for durability and resilience |
MYRTHA POOLS
|
Mat06 | Material efficiency |
MYRTHA POOLS
|